客戶舊窗換新窗
Before After

For this case, the existing windows were exchanged for new ones, and the frame-wrapped dry construction was finished within a total duration of 2 hours.

Initially, the old windows faced problems of water leakage, along with fragile rubber strips and loose glass that would shake in strong winds.

The previous window glass consisted of standard glass, which was thin and offered inadequate sound insulation.

During the on-site measurements, it was observed that the noise from passing vehicles outside the customer's residence was disruptive. It is recommended to consider airtight windows with double-layer laminated glass.

Improved sound insulation and enhanced durability have been accomplished.